This is a user report not comparing the rest of the 350 lineup. It occurred to me that in those comparisons what is missed is how did a given model work? In this case I had 4 years around a JD350B. I was not the main operator but I ran it some and I loved it.
So, the background was I worked on the State Campground building crew. That would be contracted out now but back then, contractors who knew campground builds were non existent. They farmed one job out and it was messed up, required a full time on site inspector.
This was the 2nd or 3rd year for the crew and my first. We had oil lease money and it was decided to gear up a crew decently. So we got geared up. The JD350B with its own trailer was determined to fit the bill (we put that trailer to good use on top of hauling the Dozer).
The JD350B with a 4 in 1 bucket, a backhoe that also had an auger motor you could swap out (campgrounds need lots and lots of holes! It had the reverser setup, so was easy to run back and forth was the center piece of the new gear up.
Being new I was not involved in the selection, they sure got it right. Sure a bigger model would have been a help in some cases (pun) but day in day out, that setup was perfect. Usually if we needed bigger, we needed a lot bigger and we could and did borrow a D-6 or 8 from The Local Department of Highways. Most of the time we were withing 10 miles of one. If not it was figured out in advance.
Our 350B came with the diesel engine. They had not ordered it that way, they wanted gas as we kept a 55 gallon drum gas for the Cement mixer engine, chain saws and generator (and a few gallons for the Pickup or Dump ruck if they got low and needed to get to a gas station or Dept of Highways for full fill up). The owner aspect was odd. We paid for it but technically it was Dept of Highway equipment, but given we had full use of it during our building season. Our best guess was that they were going all diesel and changed the order from a gas engine to a diesel. So I could not say how a gas engine would have done. The diesel was perfectly balanced power for the machine. We did have to get a 55 gallon drum of diesel on site. A bit annoying as a separate hand pump but once we had he drum and pump, easy enough to manage and we had to manage the 55 gallon drum of gasoline anyway.
What I can say is that little diesel was great. It started fine even o the coldest days and we pushed into some temps into the low teens in the fall a couple of times. At times the work was more than the machine could do but it was size not so much power. Generally they had a Road Contractor put in the roads, so we did not always clear much. Always some. If we did clear we borrowed a big dozer and then finished up with the JD350. We did load dump trucks with overburden and haul it out and at times we loaded our own gravel for haul back in. The blade was used to push the gravel in place and for camping spots, a tend pad got dirt and pushed flat.
We had outhouses to put in, so the Backhole was key there. We put in 4 holers so it was a good 15 feet by 8 feet hole for each one. We put in Picneic shelters that were 30 ft by 20 feet so that pad had to be cleared. Camprounds need lots of posts so the auger atachment was used a lot.
Worst job was built atop a flat glacier morriane (the glaizen was still adtive up the valley a couple of miles). You could not drill a hole in t hat stuff, if the auge did not get kicked out of line you just stirred rock up in a whole and with no fines, pull it out and you had stirred up rock.
It did not ake long to figure out that we were NOT going to line the edges of the pulloffs with Posts (per spec). Foremand decided only on Post out front with the spot number on it. What they worked out was that they litterly dug out a hole with the backhoe. Two of us would put the Post in, prop it up with rocks while the operaor was turning the JD around and scooping up a bucket of rocks (normaly for bucket work the backhold was popped off, very nice setup to get on and off so you did not have to carry it when you did not need it). Then the operaor carefully dumped some rock back in, we would level the post again, more rock and then when solid, we put a 5 gallon bucket over hte post and he would genly drop rock over it and we repated the level part if needed.
The JD350B was liteeraly the Swiss Army knife of the operation. It did not awlays run all day long but it was used pretty much every day. Bucket was handy to carry things around in, load up with sand bags for the cement operations. The trailer was used to carry all the posts and bumpers and outshoud and pcinic shelfter parts (we had a cenrtal storege area).
We never had the JD fail to run or work. Never broke down. I read about wet and dry clutch and what was better. I guess ours would be a dry clutch, did not matter. Never an issue. We hsut down for winter, could not build anyting with the groud hard and snow and low temps). Dept of Highway actualy owned it (we paid for it) so the first winter they used it on the salty sand pile in Anchorge. Rusty, not greased up right, ran like a top despite the abuse (they did change the oil!)
The next year the Forman worked out to park it at a remote Dept of Highwya station and they claimed they used it on their sand pile (only if theor own loader was down).
The 3rd year they build another crfew with another JD350B and those guys never had any issues either. They just ran and ran.
The only issue we had was the hydlaiic hose hookup between the Dozer and the backhoe. Hoses were as short as possible to fit in between and no kinks, so not a lot of room when we backuped up to atache the backhole. If we did not get them clicked in right, one of them would blow apart. It was pretty funny as you wold be going from point A to point B in the pickup and see a trail of oil on the road. Ok, divert, follow that trail becaUs we knew Earl was at the end stopped. We kept 10 gallons of hurali oil on hand for that! Jack up the backhole, getg to the hoses, reseat the blown one, good to go. No matter how ahrd we tried, hooking them up, pulling and twisigtn with the space we had, it would still not click in right though it was almost there. We got a lot better at it but we never stopped it entirely.
The best comment I read said that the dry or wet was not better or worse, they had different aspects to deal with. In our case, our was mostly parked all winter long, no issues come spring though the local Dpet of Highway had used and moved it some. They were good about firing it up inteh spring before we got going and moving it arond, geting it greased up. I suspect they changed the oil as soon as we dropped it off, we were not setup to do oil changes so we ran it for the season on the same oil. We kept oil on hand to top it up but I do not remmber it used much oil either.
Our puller truck was a dump truck. The JD350 was easy enough for it to haul with an 8 yard truck. Good thing as for the first two years we did not have our own dump truck, we got a summer loaner from Dept of Highways. That was always a junker that had been rolled doing winter plowing. Engine ran on 6 or 7 cylinders most of the time (same truck the first two years). We got our own dump truck the 3rd year with a Detroit Diesel in it. Probably a 6V53. Anything bigger than the JD350B would have needed a bigger truck (or a heavier one with a bigger engine) and an 8 yard was all we normally needed.
Kind of funny was the 2nd year myh boss got tired of the Dodge and its random missing on one or two cyliners (moving from on job to the next was a trial). So he rented a 10 yard dump truck and the local Dept of Highways figured out what the firing issue was and had it running like a Swiss watch. We need it as it was a 10% grade for 4 miles out of that location pulling the JD and the dump truck full of cement mixer, wheel barrows and random stuff, She pulled that hill on on anohter 300 miles fine. Then threw a rod though the block lightly loaded on the flat hauling materials into the next job. I think that is when they went with a new dump truck for our crew (and the forming new crew). While we had great relations with the local DOH, central in Anchroage just gave us the worst junk they had. We did not blame them, beggers and all that, but we had a window to build in and we need reliable.
How the JD350B compared to the others over more years I could not say. But for that 4 years with ours and the two years the other crew had theirs, totally reliable with never an issue. Not a broken hose, not a leak one out of anything. I love that size dozer to this day. No way I could have one but great memories of that JD350B.
So, the background was I worked on the State Campground building crew. That would be contracted out now but back then, contractors who knew campground builds were non existent. They farmed one job out and it was messed up, required a full time on site inspector.
This was the 2nd or 3rd year for the crew and my first. We had oil lease money and it was decided to gear up a crew decently. So we got geared up. The JD350B with its own trailer was determined to fit the bill (we put that trailer to good use on top of hauling the Dozer).
The JD350B with a 4 in 1 bucket, a backhoe that also had an auger motor you could swap out (campgrounds need lots and lots of holes! It had the reverser setup, so was easy to run back and forth was the center piece of the new gear up.
Being new I was not involved in the selection, they sure got it right. Sure a bigger model would have been a help in some cases (pun) but day in day out, that setup was perfect. Usually if we needed bigger, we needed a lot bigger and we could and did borrow a D-6 or 8 from The Local Department of Highways. Most of the time we were withing 10 miles of one. If not it was figured out in advance.
Our 350B came with the diesel engine. They had not ordered it that way, they wanted gas as we kept a 55 gallon drum gas for the Cement mixer engine, chain saws and generator (and a few gallons for the Pickup or Dump ruck if they got low and needed to get to a gas station or Dept of Highways for full fill up). The owner aspect was odd. We paid for it but technically it was Dept of Highway equipment, but given we had full use of it during our building season. Our best guess was that they were going all diesel and changed the order from a gas engine to a diesel. So I could not say how a gas engine would have done. The diesel was perfectly balanced power for the machine. We did have to get a 55 gallon drum of diesel on site. A bit annoying as a separate hand pump but once we had he drum and pump, easy enough to manage and we had to manage the 55 gallon drum of gasoline anyway.
What I can say is that little diesel was great. It started fine even o the coldest days and we pushed into some temps into the low teens in the fall a couple of times. At times the work was more than the machine could do but it was size not so much power. Generally they had a Road Contractor put in the roads, so we did not always clear much. Always some. If we did clear we borrowed a big dozer and then finished up with the JD350. We did load dump trucks with overburden and haul it out and at times we loaded our own gravel for haul back in. The blade was used to push the gravel in place and for camping spots, a tend pad got dirt and pushed flat.
We had outhouses to put in, so the Backhole was key there. We put in 4 holers so it was a good 15 feet by 8 feet hole for each one. We put in Picneic shelters that were 30 ft by 20 feet so that pad had to be cleared. Camprounds need lots of posts so the auger atachment was used a lot.
Worst job was built atop a flat glacier morriane (the glaizen was still adtive up the valley a couple of miles). You could not drill a hole in t hat stuff, if the auge did not get kicked out of line you just stirred rock up in a whole and with no fines, pull it out and you had stirred up rock.
It did not ake long to figure out that we were NOT going to line the edges of the pulloffs with Posts (per spec). Foremand decided only on Post out front with the spot number on it. What they worked out was that they litterly dug out a hole with the backhoe. Two of us would put the Post in, prop it up with rocks while the operaor was turning the JD around and scooping up a bucket of rocks (normaly for bucket work the backhold was popped off, very nice setup to get on and off so you did not have to carry it when you did not need it). Then the operaor carefully dumped some rock back in, we would level the post again, more rock and then when solid, we put a 5 gallon bucket over hte post and he would genly drop rock over it and we repated the level part if needed.
The JD350B was liteeraly the Swiss Army knife of the operation. It did not awlays run all day long but it was used pretty much every day. Bucket was handy to carry things around in, load up with sand bags for the cement operations. The trailer was used to carry all the posts and bumpers and outshoud and pcinic shelfter parts (we had a cenrtal storege area).
We never had the JD fail to run or work. Never broke down. I read about wet and dry clutch and what was better. I guess ours would be a dry clutch, did not matter. Never an issue. We hsut down for winter, could not build anyting with the groud hard and snow and low temps). Dept of Highway actualy owned it (we paid for it) so the first winter they used it on the salty sand pile in Anchorge. Rusty, not greased up right, ran like a top despite the abuse (they did change the oil!)
The next year the Forman worked out to park it at a remote Dept of Highwya station and they claimed they used it on their sand pile (only if theor own loader was down).
The 3rd year they build another crfew with another JD350B and those guys never had any issues either. They just ran and ran.
The only issue we had was the hydlaiic hose hookup between the Dozer and the backhoe. Hoses were as short as possible to fit in between and no kinks, so not a lot of room when we backuped up to atache the backhole. If we did not get them clicked in right, one of them would blow apart. It was pretty funny as you wold be going from point A to point B in the pickup and see a trail of oil on the road. Ok, divert, follow that trail becaUs we knew Earl was at the end stopped. We kept 10 gallons of hurali oil on hand for that! Jack up the backhole, getg to the hoses, reseat the blown one, good to go. No matter how ahrd we tried, hooking them up, pulling and twisigtn with the space we had, it would still not click in right though it was almost there. We got a lot better at it but we never stopped it entirely.
The best comment I read said that the dry or wet was not better or worse, they had different aspects to deal with. In our case, our was mostly parked all winter long, no issues come spring though the local Dpet of Highway had used and moved it some. They were good about firing it up inteh spring before we got going and moving it arond, geting it greased up. I suspect they changed the oil as soon as we dropped it off, we were not setup to do oil changes so we ran it for the season on the same oil. We kept oil on hand to top it up but I do not remmber it used much oil either.
Our puller truck was a dump truck. The JD350 was easy enough for it to haul with an 8 yard truck. Good thing as for the first two years we did not have our own dump truck, we got a summer loaner from Dept of Highways. That was always a junker that had been rolled doing winter plowing. Engine ran on 6 or 7 cylinders most of the time (same truck the first two years). We got our own dump truck the 3rd year with a Detroit Diesel in it. Probably a 6V53. Anything bigger than the JD350B would have needed a bigger truck (or a heavier one with a bigger engine) and an 8 yard was all we normally needed.
Kind of funny was the 2nd year myh boss got tired of the Dodge and its random missing on one or two cyliners (moving from on job to the next was a trial). So he rented a 10 yard dump truck and the local Dept of Highways figured out what the firing issue was and had it running like a Swiss watch. We need it as it was a 10% grade for 4 miles out of that location pulling the JD and the dump truck full of cement mixer, wheel barrows and random stuff, She pulled that hill on on anohter 300 miles fine. Then threw a rod though the block lightly loaded on the flat hauling materials into the next job. I think that is when they went with a new dump truck for our crew (and the forming new crew). While we had great relations with the local DOH, central in Anchroage just gave us the worst junk they had. We did not blame them, beggers and all that, but we had a window to build in and we need reliable.
How the JD350B compared to the others over more years I could not say. But for that 4 years with ours and the two years the other crew had theirs, totally reliable with never an issue. Not a broken hose, not a leak one out of anything. I love that size dozer to this day. No way I could have one but great memories of that JD350B.