Got done combining corn about a week ago, finished plowing Friday. Was a busy fall with the truck bed build for my son, farming, and helping Bonnie's daughter and husband with their new house build. But I did get it done before frost stopped work, was a close call tho as its frose too hard to work today.
Started just before harvest, between the truck bed and combining, we built the slab pad. Had to take the top soil off and and remove some small trees then build it up about 2' total, sand then rock for radon removal. I was surprised to find that they dont do basements much anymore, with the frist and such it was always needed to keep frost from heaving, but they claim this is better. They insulation the side of the pad and 2' out along the sides and 4' out at the corners with 2" foam then cover with 18" of fill. Supposed to be good.
My brother Don donated the machinery and labor for that job to help them keep costs down, that was very nice.
Then some pics of combining.
Combining went well, couple bearings went out, one on the combine and one on the dryer, but otherwise mostly uneventful. Did find some mud as well got 3 1/2" of rain just before I got started good. That was after one of the driest summers in my lifetime.
Got the chisel plowing all done this year, that is good.
Got that done Friday, so Saturday I went up to the house with my scraper to cut some ditches for drainage around the new house and use the dirt to back fill. Did this one Saturday
These by the drive way Sunday. The first is to show the driveway had no ditches so it would wash when it rained heavy.
The finished pad
Can only post 10 pics, but my scraper broke with maybe 2 loads left on the driveway ditch to finish, the ball that mounts the scraper to the front wheels broke off, likely because there were a lot of rocks, some hundreds of pounds, and they were hard on it. So ill have another shop project this winter.
They are starting to build today, so things are going along nicely on that project.
Started just before harvest, between the truck bed and combining, we built the slab pad. Had to take the top soil off and and remove some small trees then build it up about 2' total, sand then rock for radon removal. I was surprised to find that they dont do basements much anymore, with the frist and such it was always needed to keep frost from heaving, but they claim this is better. They insulation the side of the pad and 2' out along the sides and 4' out at the corners with 2" foam then cover with 18" of fill. Supposed to be good.
My brother Don donated the machinery and labor for that job to help them keep costs down, that was very nice.
Then some pics of combining.
Combining went well, couple bearings went out, one on the combine and one on the dryer, but otherwise mostly uneventful. Did find some mud as well got 3 1/2" of rain just before I got started good. That was after one of the driest summers in my lifetime.
Got the chisel plowing all done this year, that is good.
Got that done Friday, so Saturday I went up to the house with my scraper to cut some ditches for drainage around the new house and use the dirt to back fill. Did this one Saturday
These by the drive way Sunday. The first is to show the driveway had no ditches so it would wash when it rained heavy.
The finished pad
Can only post 10 pics, but my scraper broke with maybe 2 loads left on the driveway ditch to finish, the ball that mounts the scraper to the front wheels broke off, likely because there were a lot of rocks, some hundreds of pounds, and they were hard on it. So ill have another shop project this winter.
They are starting to build today, so things are going along nicely on that project.