Some time ago I saw a post where someone had used chains to set the height of the front of the brush hog. He did this so he didn't have to depend upon the lift holding it's position (and probably removing a lot of wear/tear on the lift parts).
I got about 2/3 of the field hogged today but at the end of the day had a problem keeping the lift in the proper position. (I know, the lift needs work, but I've got to get this field done while I can still make some headway.
I can't find the post with the image. Would you please re-post.
Thanks.
I got about 2/3 of the field hogged today but at the end of the day had a problem keeping the lift in the proper position. (I know, the lift needs work, but I've got to get this field done while I can still make some headway.
I can't find the post with the image. Would you please re-post.
Thanks.