Adirondack case guy
Well-known Member
It started out at 33F at sunrise, here. By 8:00 we had wind driven snow, which lasted until about 3:00pm. When the snow and wind stopped, the temp dropped to 1F.
At 8:00 I went out and stoked the boiler, which heats the whole house and my shop. By noon it was 74F in the shop. Great temp to mud in the sheetrock that I am installing on the ceiling. I got the front part of the shop almost ready for paint. I have most of my bench system built. Just need a few more drawers built into the far end for misc. stuff. I have all the tools to make sheetrocking pretty easy. Panel lifter, Roll-around baker to easily reach the ceiling, and a Porter Cable dustless drywall sanding wand with vac. The equipment makes hanging drywall a one man job for me.
It takes longer to move all my stuff, in the shop, from one area to another than to install, prep, and paint portions of the ceiling.
I have plenty of firewood left and it is only a few feet from the shop in a connected woodshed, all out of the elements.
Life is good here.
Loren
At 8:00 I went out and stoked the boiler, which heats the whole house and my shop. By noon it was 74F in the shop. Great temp to mud in the sheetrock that I am installing on the ceiling. I got the front part of the shop almost ready for paint. I have most of my bench system built. Just need a few more drawers built into the far end for misc. stuff. I have all the tools to make sheetrocking pretty easy. Panel lifter, Roll-around baker to easily reach the ceiling, and a Porter Cable dustless drywall sanding wand with vac. The equipment makes hanging drywall a one man job for me.
It takes longer to move all my stuff, in the shop, from one area to another than to install, prep, and paint portions of the ceiling.
I have plenty of firewood left and it is only a few feet from the shop in a connected woodshed, all out of the elements.
Life is good here.
Loren