Geo-TH,In
Well-known Member
Been thinking of designing a circuit to connect to my 110v RV genny so when the well pump draws current, all other loads like ref, 110v kitchen appliances are removed with a 3 minute delay built in. The delay will be needed to give the ref a 3 minute rest for pressures inside to equalize. That way if the pump runs for only one minute, the ref will get 3 minute rest.
Been designing this in my head. Haven't put it to paper yet. I'm just throwing it out there for the experts to post their designs first.
May consult Bubba. All good redneck make things from used or on hand electronics components. May have to check his inventory of supplies.
George
Been designing this in my head. Haven't put it to paper yet. I'm just throwing it out there for the experts to post their designs first.
May consult Bubba. All good redneck make things from used or on hand electronics components. May have to check his inventory of supplies.
George