some morning shots of this project getting close to being done, am now able to cross dam again to continue the fill and threw in a sot of the tire tank out fall I put in to use the methane production water for watering stock and the extra runs out the over flow pipe and into pond
1)crossing Dam to the north
2)new Dam face waterside
3)shot from top of Dam towards pond
4)north end of spillway towards pond
5)crossing Dam to the south
6)water over flow starting to fill pond
7)10 1/2 foot tire tank out fall