Anybody have knowledge of these? A 2X12 and an engingeeneered beam both dimensionally the same size, how much more will an engineered beam carry, 1/3 more? Is a single beam(EB) say 3x10x20, is this single beam stronger than two(EBs) 11/2x10x20 together or doesn't matter?
 
I don't know about their normal load carrying capacities, but I do know from fire training that they're a lot more likely to collapse very quickly in the event of fire. Chipboard and glue heats and burns very quickly.
I'd be using dimentional lumber myself... and if that wasn't possible I'd be using steel.

Rod
 
I put an upstairs addition on an older home 15 years ago. That addition had 24' long engineered floor trusses, they worked well and spaned the width of the house--24' (real nice) But.....those engineered trusses cost double of 2x12s.

Engineered floor trusses are needed where there is no center footing under the foundation of a home. (like my old house)

In my home that I built 10 years ago I used 2x12s 16" OC. I had 175 2x12s for the floor 16 feet long. (the cost of engineered floor trusses would have added $3-4 thousand to the lumber package.)
Engineered trusses have their place.
 

What happens in 15 or 20 years when the glue brakes down. My house was built in 1871 I bet if it was built with this new glued together junk it would have fallen down a hundred years ago. Besides those beams have no side strength they have to have all the load straight down or they fold up like a house of cards.
Walt
 
What we started to do was re-roof the house. It has a flat roof with the joists running front to back, but based on a standard length of wood there are cross beams at 16' or 12' intervals. The problem with the house roof design is they left too many trees around the house, the roof would load up with leaves and there was only one gutter on the back that would fill with water and get into the house because the metal roofing was bent over into the gutter. The ends of some joists/trusses rotted off causing more of a sag worsening the water problem. In trying to fix the joists and get a flat roof with a pitch back we discovered the cross beams. These cross beams added to the roof problem because their support posts were not directly on a floor joist, they may be on the 3/4 board between two joists. It's a two story house and some of the things that were not present during it's construction were; an inspector, a level, chalking, construction adhesive, any 2x12 material, but they had nails they may have put them in the wrong place, but they used plenty. 6 nails toe nailed in each stud. The flat roof trusses were built with a 2x8 for the ceiling joist and a 2x6 nailed to it at an angle rising for the roof pitch. The lack of nails allowed the 2x6s to sag.
The pitch of the roof is about 3/8 in 12. I built a shed roof on one part with a 4/12 pitch. The front of the shed roof is a major truss I build to span 24 feet. It's 3/4 plywood on it's side, picture framed and sandwiched with 2x8s on the top, 2x12s on the bottom and 2x6s every four feet for the up rights. Glued and screwed. This shed roof was to add appeal to the house since it's like two old trailer houses stacked on top of each other, the shed roof is a cathedral. and another joist hangs onto it instead of on a post with no support and no way to support. Four beams replaced with stouter better constructed and one to go.
 
I don't worry about trusses if they're made correctly. What I don't like is the use of chipboard as a substitute for structural material. The biggest problem with those things is that they have no thermal mass and if they are exposed to fire they burn through an collapse very quickly leading to a complete structural collapse... Using dimentional lumber you have a margin of error... and it also takes a lot more fire to get the structure burning.

Rod
 
Plywood seems to hold up for a lot of years even wet while osb swells.
Most lumber yards I shop at will tell you what's indoor/outdoor. I've had some $25 sheet(50year) underlayment that I've used outside and some $10 sheet that swelled with a cup of water spilled on it.
 
to answer your question.....
if the board and the engineered beam are made out of the same material (pine, fir) so they compress about the same, there load carrying capacity is the same......HOWEVER the reason modern day uses engineered beams is because if there is a structural defect in the wrong place on the lumber (let's say a knot goes from the edge in 1" on the lumber) then the lumer is only acting like an 11 board instead of a 12" board - which may not sound like a lot - but a 2X6 is 3.5 times stronger than a 2x4 on edge..... that is also why real truss manufacturing places among others use specially graded lumber which reduce these type of defects.....again depends on what kind of loading is going to happen also.....
next question.... would 2 1.5" beams be twice as strong as one and be the same as a 3" beam....
basic answer is yes AS LONG AS it acts like one piece.....for example if you take 2 skinny members, place them side by side, and start loading them, if they start to seperate or lean as the load is applied then they are not acting as one unit, and will fail before the loading of the single unit that was twice as big BUT if the two skinny beams are attached together and act as one unit, then, yes they will be as strong as a single unit which is twice as thick......

Another example....place a playing card like a bridge, supported on each end.....pressing down in the middle will act as the load.....if you use more cards it will hold more load, BUT if you take a whole deck of cards and place them on this made up bridge you can still press down in the middle and make the whole deck of cards curve or deflect downward, because they are not acting like one unit.....now take that deck of cards and glue each card to the one below it so when you are done the whole deck of cards is glued together, now place that glued up deck of ards on the supprots and press in the middle - it will hold WAY more load before a significant bending or failure will occur because all the cards are acting as a single unit