Longbeards
Member
Has anyone built a subframe for a 3 pt backhoe? I have a 4000 SU with a 730 loader (3400 front end) . I bought an international 3pt hoe that is very heavy. I've used it a little for light ditch work but plan to bolt it solid for some culvert placement. It has a sleeve for the drawback which makes lifting it into place difficult. I was thinking of U-bolting some channel to the loader frame for the lower pins. If doing that would I need to run all the way to front axle or would going as far as the operator station be sufficientb since since the pressure is on the loader already? I still need to be able to remove it for plowing, hogging and such. Any suggestions for the top link?
Last question: the original pto pump quit and the owner replaced it with a bigger one (29 gpm he said). The movement is powerful but erratic(too fast). Should I downsize the pump or get different controls? I'm mostly looking at cost. The higher flow pump on it does leak around the shaft if left on the pto. If I hang it higher than the tank it's good. (resale concern). How hard are they to rebuild?
Last question: the original pto pump quit and the owner replaced it with a bigger one (29 gpm he said). The movement is powerful but erratic(too fast). Should I downsize the pump or get different controls? I'm mostly looking at cost. The higher flow pump on it does leak around the shaft if left on the pto. If I hang it higher than the tank it's good. (resale concern). How hard are they to rebuild?