Hi,
I'm the guy that posted about the starter problem earlier. Still haven't found a way to get the starter to turn the flywheel, so I'm really starting to think that I'll have to either replace the ring gear, or at least re-install it so that there is enough engagement with the starter pinion gear.
There is a small approx. 2mm gap between the ring gear and the flange on the flywheel. The problem is that I don't know if that gap was always there, or if the ring gear shifted when my first starter failed and fell apart.
My tractor is a 1949 TO-20 (serial #6724), with the ring gear mounting from the transmission side.
Has anyone ever replaced a ring gear that has this kind of mounting?
Is the ring gear just pressed on to a hub on the flywheel, or is it bolted on?
I have the I&T shop manual, and it says "The starter ring gear can be renewed after removing the flywheel. To install a new ring gear, heat same to 500 deg. F.and install on flywheel with beveled end of teeth facing timing gear end of engine. One flywheel mounting bolt hole is off center.
On models TO20 prior 10282, the ring gear is mounted to the flywheel from the rear. If ring gear requires renewal where this construction is found, it will be necessary to install the later type TO flywheel and ring gear assembly. (Ferg. Part No. Z-120C4020)."
My tractor is prior to 10282 (serial #6724)
Does this mean that the flywheel is heated and pressed on from the rear, or mounted with bolts, or with a combination of the two methods?
There are no diagrams, illustrations, or pictures, that show the ring gear mounting method to the flywheel anywhere in the manual.
If anyone knows anything about the ring gear mounting to the flywheel, it would really help to determine what I'm up against, should I decide to split the tractor.
THANKS!.................................Jack
[/quote]
I'm the guy that posted about the starter problem earlier. Still haven't found a way to get the starter to turn the flywheel, so I'm really starting to think that I'll have to either replace the ring gear, or at least re-install it so that there is enough engagement with the starter pinion gear.
There is a small approx. 2mm gap between the ring gear and the flange on the flywheel. The problem is that I don't know if that gap was always there, or if the ring gear shifted when my first starter failed and fell apart.
My tractor is a 1949 TO-20 (serial #6724), with the ring gear mounting from the transmission side.
Has anyone ever replaced a ring gear that has this kind of mounting?
Is the ring gear just pressed on to a hub on the flywheel, or is it bolted on?
I have the I&T shop manual, and it says "The starter ring gear can be renewed after removing the flywheel. To install a new ring gear, heat same to 500 deg. F.and install on flywheel with beveled end of teeth facing timing gear end of engine. One flywheel mounting bolt hole is off center.
On models TO20 prior 10282, the ring gear is mounted to the flywheel from the rear. If ring gear requires renewal where this construction is found, it will be necessary to install the later type TO flywheel and ring gear assembly. (Ferg. Part No. Z-120C4020)."
My tractor is prior to 10282 (serial #6724)
Does this mean that the flywheel is heated and pressed on from the rear, or mounted with bolts, or with a combination of the two methods?
There are no diagrams, illustrations, or pictures, that show the ring gear mounting method to the flywheel anywhere in the manual.
If anyone knows anything about the ring gear mounting to the flywheel, it would really help to determine what I'm up against, should I decide to split the tractor.
THANKS!.................................Jack
[/quote]