Yesterday I poured two small post piers 12X12 inches by six inches high, I coated
the 2x6 wood forms with spray PAM. I can either remove them in the next two days
or else I have to leave them in place for several weeks until I get back to them.
I used bag concrete mix. The temperatures here are forecast in the 70's for the
next two days and then steady 50's, I think we had a slight frost last night. They
are under a barn so protected from rain. Which is better to limit any damage to
the concrete and to make removal go smoothly? Now or later?
the 2x6 wood forms with spray PAM. I can either remove them in the next two days
or else I have to leave them in place for several weeks until I get back to them.
I used bag concrete mix. The temperatures here are forecast in the 70's for the
next two days and then steady 50's, I think we had a slight frost last night. They
are under a barn so protected from rain. Which is better to limit any damage to
the concrete and to make removal go smoothly? Now or later?