I've got to build a ramp between two concrete retaining walls. I don't have much experience pouring concrete with slope to it. When I've had to do it in the past, I've gotten it done somehow, but without ever feeling that I was totally on top of the situation.
The ramp will be 48" wide. It has to rise 30" in 18' which works out to 1.67" rise per foot. The bottom half of the ramp will be directly on undisturbed hard clay soil. I will remove the loose topsoil down to the clay layer for the top half and bring up the level to pouring height with crushed rock.
I'll be mixing the concrete with a mixer. I'd like to get some experienced help but I probably won't be able to. Anyway, I prefer to work alone. I don't have to do the whole pour in one day.
What can anyone tell me that will make this go better? I like concrete work a lot when I know what I'm doing, and I don't like it at all when I'm making it up as I go.
Thanks, Stan
The ramp will be 48" wide. It has to rise 30" in 18' which works out to 1.67" rise per foot. The bottom half of the ramp will be directly on undisturbed hard clay soil. I will remove the loose topsoil down to the clay layer for the top half and bring up the level to pouring height with crushed rock.